Mikvas Mei Menachem is now completed,
This pictorial follows the construction of our new Mikvah
THE NEWEST PICTURES ARE AT THE BOTTOM
As of September 25, 2004
Rabbi/Engineer Grossbaum checks the plans The tractor goes into the hole
As of October 27, 2004 As of November10, 2004
The Mikvah well structure is completed The base structure begins to take form
As of December 8, 2004
A glimpse of an exit for the Mikvah
The Mikvah's foyer as it begins to take shape
As of January 15, 2005
The entrance to the Mikvah The anteroom with it's bay windows
The drop ceiling above the Mikvah
As of January 31, 2005
Future site of the garden tub The Mikvah room takes face
A glimpse into one of two preparatory rooms Light fills the Mikvah's foyer
As of February 17, 2005

The complex water plumping system is completed The base for the garden tub is tiled
As of March 8, 2005

The Mikvah, a southeast and southwest view
The anteroom newly decorated and painted The preparatory room is tiled
The Mikvah room is tiled and nearing completion
As of April 8, 2005
The glass shower wall is installed The Mikvah tiling nears completion

The granite countertop is in place as well as the stone tiling surrounding the garden tub.